Cobalt Manufacturing — shop-floor ERP
Paper route cards and four disconnected spreadsheets replaced by a tablet-first production system that talks to the finance package.
Cobalt tracked 600 daily production steps on paper route cards. Rework was discovered at dispatch, and nobody could answer "where is order 4412?" without walking the floor.
What we built
A tablet-first production application with barcode scanning at each station, live work-in-progress visibility, quality checkpoints with photo capture, and a nightly two-way sync with their finance system. Offline mode keeps the line running when Wi-Fi drops.
Result
Rework detected at source increased by 3.4x, on-time dispatch improved to 97%, and the paper route cards are gone.
Let's talk about your site
We will tell you what we would do first — and what we would not spend money on.
Ready to modernise the infrastructure your business runs on?
Tell us what is slowing you down. We will come back within one business day with a clear next step — usually a 30-minute call and a free site assessment.